Skip to Content

Cekol Termo W2 - mesh adhesive - white - 25kg

https://renderstore.co.uk/web/image/product.template/7114/image_1920?unique=12c9c14

What is Cekol Termo W2?

Cekol Termo W2 is a high-strength, cement-based Universal Mortar designed for fixing mineral wool insulation boards and creating the reinforced basecoat layer. It is highly vapour-permeable (breathable) and fiber-reinforced to provide maximum resistance to cracking and thermal stress, making it an ideal choice for fire-rated External Wall Insulation (EWI) systems.


Technical SpecificationValue / Detail
Material BaseCement, mineral fillers, and modifying polymers
Primary UseFixing & Basecoating Mineral Wool (Rockwool)
Fiber ReinforcementYes (High crack resistance)
Vapour PermeabilityVery High (Permeable to water vapor)
Consumption (Fixing)Approx. 4.0 – 5.0 kg/m²
Consumption (Basecoat)Approx. 4.0 – 5.0 kg/m²
Adhesion to Concrete≥ 0.5 MPa


  • Can I use Cekol Termo W2 for EPS (Polystyrene)?
    While Termo W2 is specifically optimized for the fibrous nature of Mineral Wool, it can be used for EPS. However, for standard EPS projects, many contractors prefer Cekol Termo S or Termo S+, which are specifically formulated for polystyrene and offer a more cost-effective solution.
  • Why is Termo W2 recommended for Mineral Wool?
    Mineral Wool systems are typically chosen for their fire resistance and breathability. Cekol Termo W2 supports these properties by offering a high vapour-diffusion rate, ensuring that moisture doesn't get trapped within the insulation layer, which maintains the thermal efficiency of the building.
  • What is the drying time for Cekol Termo W2?
    Under standard conditions (+20°C), the mortar sets sufficiently for mechanical fixing (insulation pins) within 24 to 48 hours. Before applying the final render, the basecoat layer should be allowed to dry for at least 3 to 5 days, depending on the weather.
  1. Mixing: Mix one 25kg bag with approx. 5.5L – 6.0L of clean water. Allow it to sit for 5 minutes, then mix again.
  2. Board Preparation: Apply a thin "scratch coat" of W2 to the mineral wool board to flatten the fibers before applying the main adhesive dabs.
  3. Fixing: Apply the adhesive around the perimeter and in the center of the board, then press firmly to the substrate.
  4. Basecoating: After the boards are fixed and pinned, apply a 3mm – 5mm layer of W2.
  5. Mesh Embedding: Lay the fiberglass mesh into the wet mortar and smooth over with a flat trowel.
  • Pro-Tip on Fire Safety: When working on buildings over 11 meters, Mineral Wool and W2 are often required to meet UK fire safety regulations. Always ensure your basecoat covers 100% of the mesh for maximum fire and impact protection.
  • Pro-Tip for Large Projects: Cekol Termo W2 has an excellent "open time," meaning it stays workable in the bucket for longer. This is a major advantage for large-scale elevations where application takes longer. 


£ 24.50 24.5 GBP £ 24.50 Tax Excluded

£ 24.50 Tax Excluded

Not Available For Sale

This combination does not exist.

cekol Heavy >15kg

Terms and Conditions
30-day money-back guarantee
Shipping: 2-3 Business Days